URGO, MARCELLO

URGO, MARCELLO  

DIPARTIMENTO DI MECCANICA  

Mostra records
Risultati 1 - 20 di 85 (tempo di esecuzione: 0.026 secondi).
Titolo Data di pubblicazione Autori File
A b&b approach to schedule a no-wait flow shop to minimize the residual work content under uncertainty 1-gen-2018 DOLCEAMORE, SIMONEMarcello Urgo
A branch-and-bound approach for the single machine maximum lateness stochastic scheduling problem to minimize the value-at-risk 1-gen-2019 Urgo, M. +
A branch-and-bound approach for the two-machine flow shop stochastic scheduling problem to minimize the value-at-risk 1-gen-2021 Lei LiuMarcello Urgo
A branch-and-bound approach to minimise the value-at-risk of the makespan in a stochastic two-machine flow shop 1-gen-2023 Liu L.Urgo M.
A branch-and-bound approach to schedule a no-wait flow shop to minimize the CVaR of the residual work content 1-gen-2019 Urgo, M.
A Concept for a Pallet Configuration Approach Using Zero-point Clamping Systems 1-gen-2016 PELLEGRINELLI, STEFANIATERKAJ, WALTERURGO, MARCELLO
A digital factory platform for the design of roll shop plants 1-gen-2019 Terkaj W.TOLIO TULLIO ANTONIO MARIA.Urgo M. +
A Discrete Time Markov Decision Process to support the scheduling of re-manufacturing activities 1-gen-2021 Marcello Urgo +
A guideline for planning and implementing an action-based and transnational course in higher engineering education: A Case for Sustainable Value Creation 1-gen-2017 URGO, MARCELLO +
A human modelling and monitoring approach to support the execution of manufacturing operations 1-gen-2019 Urgo, MarcelloTarabini, MarcoTolio, Tullio
A Kronecker Algebra Formulation for Markov Activity Networks with Phase-Type Distributions 1-gen-2022 Alessio AngiusMarcello Urgo +
A kronecker algebra formulation for markov activity networks with phase-type distributions 1-gen-2021 Angius A.Urgo M. +
A learning workflow based on an integrated digital toolkit to support education in manufacturing system engineering 1-gen-2022 Berardinucci F.Colombo G.Lorusso M.Manzini M.Terkaj W.Urgo M.
A Markovian Approach for Stochastic Scheduling in Manufacturing-to-Order Production Systems to Support Due Date Quoting 1-gen-2013 URGO, MARCELLO
A mathematical foundation to support bidirectional mappings between digital models: an application of multi-scale modelling in manufacturing 1-gen-2022 Terkaj, WUrgo, M +
A path planning algorithm for industrial processes under velocity constraints with an application to additive manufacturing 1-gen-2017 GIBERTI, HERMESSBAGLIA, LUCAURGO, MARCELLO
A predictive–reactive approach for the sequencing of assembly operations in an automated assembly line 1-gen-2022 Manzini M.Demeulemeester E.Urgo M.
A proactive-reactive approach to schedule an automotive assembly line 1-gen-2018 Massimo ManziniMarcello Urgo +
A project scheduling approach to production and material requirement planning in Manufacturing-to-Order environments 1-gen-2012 TOLIO, TULLIO ANTONIO MARIAURGO, MARCELLO +
A project scheduling approach to production planning with feeding precedence relations 1-gen-2011 ALFIERI, ARIANNATOLIO, TULLIO ANTONIO MARIAURGO, MARCELLO