URGO, MARCELLO

URGO, MARCELLO  

DIPARTIMENTO DI MECCANICA  

Mostra records
Risultati 1 - 19 di 19 (tempo di esecuzione: 0.025 secondi).
Titolo Data di pubblicazione Autori File
A Kronecker Algebra Formulation for Markov Activity Networks with Phase-Type Distributions 1-gen-2022 Alessio AngiusMarcello Urgo +
AI-Based Pose Estimation of Human Operators in Manufacturing Environments 1-gen-2024 Urgo, MarcelloBerardinucci, Francesco +
An Approximate Approach for the Verification of Process Plans with an Application to Reconfigurable Pallets 1-gen-2021 Manzini M.Urgo M.
Comparing Traditional and eXtended Reality-Based Learning: Effects on Performance, Emotions, and Cognitive Aspects 1-gen-2026 Urgo, Marcello +
Design of sustainable product life cycles 1-gen-2009 COLLEDANI, MARCELLOIOVANE, FRANCESCOTOLIO, TULLIO ANTONIO MARIAURGO, MARCELLO
Development of a Project-Oriented and Transnational Master Course for Training the Engineering Competencies 1-gen-2018 Urgo, Marcello +
Digital Twin for Factories: Challenges and Industrial Applications 1-gen-2024 Terkaj W.Annoni M.Pessot E.Urgo M. +
Digital Twin-Based Approaches for Industrial Equipment in the Timber Industry 1-gen-2026 Berardinucci, FrancescoColombo, GiorgioRossoni, MarcoUrgo, Marcello
Digital Twin-Based Approaches to Support Human Operators and Safety in the Timber Industry 1-gen-2026 Berardinucci, FrancescoColombo, GiorgioRossoni, MarcoUrgo, Marcello +
Exploiting Modular Pallet Flexibility for Product and Process Co-evolution Through Zero-Point Clamping Systems 1-gen-2019 Urgo, MarcelloTerkaj, WalterPellegrinelli, StefaniaBORGO, STEFANO +
Modular Wooden Construction: Principles, Technologies, and Business Innovations 1-gen-2026 Urgo, Marcello +
Precise Localisation Technologies for the Industry 1-gen-2026 Berardinucci, FrancescoUrgo, Marcello +
Project scheduling for aggregate production scheduling in make-to-order environments 1-gen-2015 ALFIERI, ARIANNAURGO, MARCELLO
Scheduling Remanufacturing Activities for the Repair of Turbine Blades: An Approximate Branch and Bound Approach to Minimize a Risk Measure 1-gen-2022 Liu L.Urgo M.
Stochastic Scheduling with General Distributed Activity Durations Using Markov Activity Networks and Phase-Type Distributions 1-gen-2014 URGO, MARCELLO
Strategic Action Line LI4: High Efficiency and Zero Defect 1-gen-2024 Urgo M.Rampa V. +
Use Case Category 1: Data Driven Sawmill and Woodworking Machine 1-gen-2026 Marcello UrgoMarco Rossoni +
Use Case Category 2: Modular Wood House Factory 1-gen-2026 Marcello UrgoMarco Rossoni +
Use Case Category 3: Construction and Renovation with Wooden Elements, Valorisation of Composite Waste 1-gen-2026 Marcello UrgoMarco Rossoni +