Sfoglia per Autore
Outsource Planning in Presence of Rework Activities
2006-01-01 Tolio, Tullio; Urgo, Marcello
Planning of machining centres production: the role of precedence modelling
2007-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
A rolling horizon approach to plan outsourcing in manufacturing-to-order environments affected by uncertainty
2007-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
Project scheduling for production planning: a stochastic programming approach with feeding precedence contraints
2008-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello; Alfieri, Arianna
Design of Flexible Transfer Lines to Minimize Equipment Cost: A Configuration Approach and Solution Characterization
2008-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
Production and Material Requirements Planning in Manufacturing-to-Order Environments: an Application to Machining Centers Production
2008-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello; Alfieri, Arianna
Project Scheduling with Feeding Precedence Relations: an Application to Production Planning
2008-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello; Alfieri, Arianna
Design of sustainable product life cycles
2009-01-01 Colledani, Marcello; Iovane, Francesco; Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
A project scheduling approach to production planning with feeding precedence relations
2011-01-01 Alfieri, Arianna; Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
Robust production control against propagation of disruptions
2011-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello; J., Vancza
Holistic approach for jointly designing dematerialized machine tools and production systems enabling flexibility-oriented business
2012-01-01 Copani, G.; Leonesio, M.; Molinari Tosatti, L.; Pellegrinelli, Stefania; Urgo, Marcello; Valente, A.; Zulaika, J.
New business models and configuration approaches for focused-flexibility manufacturing systems
2012-01-01 Copani, Giacomo; Urgo, Marcello
A two-stage stochastic programming project schedulingapproach to production planning
2012-01-01 Alfieri, Arianna; Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
Modeling and simulation of production systems supported by a virtual factory framework
2012-01-01 Terkaj, Walter; Urgo, Marcello; B., Kadar; G., Popovics; L., Kemény
Stochastic Scheduling of Machining Centers Production Using a Markov Activity Network
2012-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
A project scheduling approach to production and material requirement planning in Manufacturing-to-Order environments
2012-01-01 A., Alfieri; Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
Virtual factory data model to support performance evaluation of production systems
2012-01-01 Terkaj, Walter; Urgo, Marcello
Design of flexible transfer lines: A case-based reconfiguration cost assessment
2013-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
Virtual Factory: an Integrated Framework for Manufacturing Systems Design and Analysis
2013-01-01 Tolio, TULLIO ANTONIO MARIA; M., Sacco; Terkaj, Walter; Urgo, Marcello
Stochastic Scheduling of Machining Centers Production, Estimating the Makespan Distribution
2013-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
Integrated Virtual Platform for Manufacturing Systems Design
2013-01-01 Colledani, Marcello; Pedrielli, Giulia; Terkaj, Walter; Urgo, Marcello
A Markovian Approach for Stochastic Scheduling in Manufacturing-to-Order Production Systems to Support Due Date Quoting
2013-01-01 Urgo, Marcello
A risk management-based evaluation of inventory allocations for make-to-order production
2013-01-01 Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
Analysis of activity networks with phase type distributions by Kronecker algebra
2014-01-01 Angius, Alessio; Horvath, Andras; Urgo, Marcello
Ontology-based modeling of production systems for design and performance evaluation
2014-01-01 Terkaj, Walter; Urgo, Marcello
A Robust scheduling approach for a single machine to optimize a risk measure
2014-01-01 Urgo, Marcello; Váncza, József
Stochastic Scheduling with General Distributed Activity Durations Using Markov Activity Networks and Phase-Type Distributions
2014-01-01 Urgo, Marcello
A Virtual factory data model as a support tool for the simulation of manufacturing systems
2014-01-01 Terkaj, Walter; Urgo, Marcello
Innovative flexibility-oriented business models and system configuration approaches: An industrial application
2015-01-01 Copani, Giacomo; Urgo, Marcello
Critical Components Evaluation in Manufacturing-To-Order Processes
2015-01-01 Manzini, Massimo; Urgo, Marcello
An integrated framework for combined designing dematerialised machine tools and production systems enabling flexibility-oriented business models
2015-01-01 Copani, Giacomo; Leonesio, Marco; MOLINARI TOSATTI, Lorenzo; Pellegrinelli, Stefania; Urgo, Marcello; Valente, Anna
Project scheduling for aggregate production scheduling in make-to-order environments
2015-01-01 Alfieri, Arianna; Urgo, Marcello
A virtual factory approach for in situ simulation to support production and maintenance planning
2015-01-01 Terkaj, Walter; Tolio, TULLIO ANTONIO MARIA; Urgo, Marcello
Makespan estimation of a production process affected by uncertainty: Application on MTO production of NC machine tools
2015-01-01 Manzini, Massimo; Urgo, Marcello
Calculating the joint distribution of n batch delivery spans in a stochastic permutation flow shop
2016-01-01 Angius, Alessio; Horváth, András; Urgo, Marcello
Scheduling a single resource using a B&B approach to limit the total tardiness under uncertainty
2016-01-01 Urgo, Marcello
The RobustPlaNet Project: Towards Shock-Robust Design Of Plants And Their Supply Chain Networks
2016-01-01 Jauregui Becker, Juan M.; Kadar, Botond; Colledani, Marcello; Stricker, Nicole; Urgo, Marcello; Unglert, Johannes; Gyulai, Dávid; Moser, Emanuel
Co-Definition of Product Structure and Production Network for Frugal Innovation Perspectives: Towards a Modular-based Approach
2016-01-01 Belkadi, Farouk; Buergin, Jens; Gupta, Ravi Kumar; Zhang, Yicha; Bernard, Alain; Lanza, Gisela; Colledani, Marcello; Urgo, Marcello
Equipment selection and evaluation approach for an adaptable assembly line
2016-01-01 Angius, Alessio; Colledani, Marcello; Manzini, Massimo; Ratti, Andrea; Urgo, Marcello
Design and management of reconfigurable assembly lines in the automotive industry
2016-01-01 Colledani, Marcello; Gyulai, Dávid; Monostori, László; Urgo, Marcello; Unglert, Johannes; Van Houten, Fred
An onto-based interoperability framework for the connection of PLM and production capability tools
2016-01-01 Lafleur, Maxime; Terkaj, Walter; Belkadi, Farouk; Urgo, Marcello; Bernard, Alain; Colledani, Marcello
Development of a project-oriented and transnational master course for training the engineering competencies required in an increasingly demanding work-life in Europe
2016-01-01 Stock, Tim; Haskins, Cecilia; Gładysz, Bartłomiej; Urgo, Marcello; Kohl, Holger; Ola Strandhagen, Jan; Jarzębowska ITLMS Elżbieta Jarzębowska, Elżbieta; Tolio, TULLIO ANTONIO MARIA
A Concept for a Pallet Configuration Approach Using Zero-point Clamping Systems
2016-01-01 Pellegrinelli, Stefania; Terkaj, Walter; Urgo, Marcello
Zero-point fixture systems as a reconfiguration enabler in flexible manufacturing systems
2016-01-01 Urgo, Marcello; Terkaj, Walter; Cenati, Claudio; Giannini, Franca; Monti, Marina; Pellegrinelli, Stefania
Development of a project-oriented and transnational master course for training the engineering competencies
2017-01-01 Haskins, Cecilia; Stock, Tim; Gładysz, Bartłomiej; Urgo, Marcello
A guideline for planning and implementing an action-based and transnational course in higher engineering education: A Case for Sustainable Value Creation
2017-01-01 T., Stock; C., Haskins; B., Gładysz; Urgo, Marcello; H., Kohl
Answer set programming for modeling and reasoning on modular and reconfigurable transportation systems
2017-01-01 Terkaj, Walter; Urgo, Marcello; Andolfatto, Daniela
A path planning algorithm for industrial processes under velocity constraints with an application to additive manufacturing
2017-01-01 Giberti, Hermes; Sbaglia, Luca; Urgo, Marcello
Sustainable Innovation in a Multi-University Master Course
2017-01-01 Bartlomiej, Gladysz; Urgo, Marcello; Gaspari, Lorenzo; Pozzan, Giovanna; Tim, Stock; Cecilia, Haskins; Elzbieta, Jarzebowska; Holger, Kohl
A b&b approach to schedule a no-wait flow shop to minimize the residual work content under uncertainty
2018-01-01 Dolceamore, Simone; Urgo, Marcello
Legenda icone
- file ad accesso aperto
- file disponibili sulla rete interna
- file disponibili agli utenti autorizzati
- file disponibili solo agli amministratori
- file sotto embargo
- nessun file disponibile