ALFIERI, ARIANNA
 Distribuzione geografica
Continente #
NA - Nord America 1.753
EU - Europa 383
AS - Asia 107
SA - Sud America 3
AF - Africa 2
Continente sconosciuto - Info sul continente non disponibili 1
OC - Oceania 1
Totale 2.250
Nazione #
US - Stati Uniti d'America 1.725
IT - Italia 79
AT - Austria 73
VN - Vietnam 44
UA - Ucraina 43
CN - Cina 39
GB - Regno Unito 32
FI - Finlandia 30
DE - Germania 29
ES - Italia 29
CA - Canada 26
IE - Irlanda 19
FR - Francia 15
BE - Belgio 12
SE - Svezia 10
JO - Giordania 9
CH - Svizzera 7
HK - Hong Kong 4
TR - Turchia 4
IN - India 3
NL - Olanda 3
CI - Costa d'Avorio 2
CO - Colombia 2
PA - Panama 2
AE - Emirati Arabi Uniti 1
AU - Australia 1
BR - Brasile 1
EU - Europa 1
IR - Iran 1
NO - Norvegia 1
RU - Federazione Russa 1
SG - Singapore 1
TH - Thailandia 1
Totale 2.250
Città #
Fairfield 270
Chandler 217
Woodbridge 180
Ashburn 173
Wilmington 131
Seattle 119
Houston 102
Ann Arbor 96
Cambridge 92
Vienna 73
Dearborn 36
Medford 30
Málaga 29
Lawrence 26
Ottawa 24
Dong Ket 23
Dublin 19
Jacksonville 17
Beijing 14
Shanghai 13
Brussels 11
Des Moines 11
Helsinki 10
Washington 10
Amman 9
San Diego 9
Redwood City 8
Boardman 6
Central District 4
Miami 4
Milan 4
Norwalk 4
Zurich 4
Amsterdam 3
Auburn Hills 3
Costa Di Mezzate 3
Istanbul 3
Kreuzlingen 3
Neustadt 3
Turin 3
Zhengzhou 3
Abidjan 2
Cologne 2
Cusano Milanino 2
Dallas 2
Hamburg 2
Hanover 2
Kunming 2
Lecco 2
London 2
Los Angeles 2
Mountain View 2
Nardò 2
Acton 1
Amherst 1
Bangalore 1
Bangkok 1
Baotou 1
Camporosso 1
Cava 1
El Dorado 1
Falls Church 1
Frankfurt am Main 1
Guangzhou 1
Göttingen 1
Hefei 1
Hounslow 1
Indiana 1
Islington 1
Kilburn 1
Kundan 1
Leawood 1
Leuven 1
Melbourne 1
Montréal 1
New Orleans 1
New York 1
Orlando 1
Pueblo Nuevo 1
Quattordio 1
Québec 1
Rome 1
Samara 1
San Francisco 1
Shaoxing 1
Sharjah 1
São Paulo 1
Tappahannock 1
Torino 1
Witten 1
Totale 1.863
Nome #
Integrated simulation-optimisation of pull control systems 123
Project scheduling for aggregate production scheduling in make-to-order environments 122
Discrete event optimization: Single-run integrated simulation-optimization using mathematical programming 118
Design and control of manufacturing systems: a discrete event optimisation methodology 112
Mathematical programming models for joint simulation–optimization applied to closed queueing networks 108
A two-stage stochastic programming project schedulingapproach to production planning 105
A project scheduling approach to production planning with feeding precedence relations 104
A parallel tabu search for solving the primal buffer allocation problem in serial production systems 99
Simulation-based Benders Cuts: A New Cutting Approach to Approximately Solve Simulation-Optimization Problems 97
Event Relationship Graph Lite: Event based modeling for simulation-optimization of control policies in discrete event systems 92
Improving surgical outcomes through optimal volumes allocation 91
A column generation algorithm for the Buffer Allocation Problem approximated by the Time Buffer concept 87
Project Scheduling with Feeding Precedence Relations: an Application to Production Planning 85
A managerial use of the volume-outcome association for hospital planning 80
Mathematical programming time-based decomposition algorithm for discrete event simulation 76
A simulation based cut generation approach to improve deo efficiency: The buffer allocation case 76
The time buffer approximated Buffer Allocation Problem: A row–column generation approach 73
Production and Material Requirements Planning in Manufacturing-to-Order Environments: an Application to Machining Centers Production 71
Time Buffer Control System for multi-stage production lines 68
Integrating Simulation Modeling and Optimization: an Event Based Approach 65
A simulation-based benders' cuts generation for the joint workstation, workload and buffer allocation problem 64
A mathematical programming based algorithm for the optimization of production systems 59
An Algorithm for Simulation-Optimization of Multi-Stage Flow Lines 55
Approximate bounds for the buffer allocation problem using mathematical programming representation 49
Feasibility Cut Generation by Simulation: Server Allocation in Serial-Parallel Manufacturing Systems 45
Project scheduling for production planning: a stochastic programming approach with feeding precedence contraints 44
Simulation Cutting Approach: Joint Workstation, Workload and Buffer Allocation Problem 39
Sample-Path Exact Algorithm for Resource Allocation in Queueing Systems with Performance Constraints 30
Buffer allocation problem in production flow lines: A new Benders-decomposition-based exact solution approach 25
Reducing resupply time with additive manufacturing in spare part supply chain 16
Generation of mathematical programming representations for discrete event simulation models of timed petri nets 4
Analytical models for flow time estimation of additive manufacturing machines 2
Totale 2.284
Categoria #
all - tutte 7.075
article - articoli 2.847
book - libri 0
conference - conferenze 3.912
curatela - curatele 0
other - altro 0
patent - brevetti 0
selected - selezionate 0
volume - volumi 316
Totale 14.150


Totale Lug Ago Sett Ott Nov Dic Gen Feb Mar Apr Mag Giu
2018/2019239 0 0 0 0 0 0 0 0 0 62 98 79
2019/2020659 35 61 12 51 88 85 80 73 70 34 45 25
2020/2021288 20 29 36 24 20 21 6 21 18 24 18 51
2021/2022192 6 16 13 9 13 16 6 18 12 18 20 45
2022/2023420 31 55 13 47 39 70 3 36 55 34 24 13
2023/2024153 13 29 3 31 16 43 3 7 8 0 0 0
Totale 2.284