Sarroch plant (CA, Italy) is an industrial area listed in the Italian Priority List of polluted sites. Pollution in groundwater has been addressed thanks to the design of a remediation action based on the aerobic biodegradation of petroleum hydrocarbons (predominantly mono-aromatic and short-chain aliphatic hydrocarbons) promoted by the injection of oxygen-releasing compounds. The feasibility of biostimulation at the site was preliminary assessed by means of laboratory tests. The direct push injection of the product has been foreseen at 2800 points, distributed along multiple lines perpendicular to the groundwater flow direction, over a total length of approximately 8 km and a total area of 90 hectares. According to the pollutant concentration measured in the different zones of the site, a different number of injection campaigns and injection frequency has been scheduled (3 to 10 campaigns, every 5 to 12 months). The estimated cost for the bioremediation action is 23 million Euros. Compared to the previous project approved in 2010, including a seafront physical barrier and groundwater circulation wells – in situ well stripping, the in situ injection of the oxygen-releasing compounds is an improvement toward a quicker, more effective and sustainable remediation of groundwater at the site. In view of all this, in 2017 the public authorities approved the variant of the project.
In Situ Aerobic Biostimulation of Groundwater at a National Priority Site in Italy
Andrea Mastorgio;Gabriele Beretta;Sabrina Saponaro;Elena Sezenna;
2019-01-01
Abstract
Sarroch plant (CA, Italy) is an industrial area listed in the Italian Priority List of polluted sites. Pollution in groundwater has been addressed thanks to the design of a remediation action based on the aerobic biodegradation of petroleum hydrocarbons (predominantly mono-aromatic and short-chain aliphatic hydrocarbons) promoted by the injection of oxygen-releasing compounds. The feasibility of biostimulation at the site was preliminary assessed by means of laboratory tests. The direct push injection of the product has been foreseen at 2800 points, distributed along multiple lines perpendicular to the groundwater flow direction, over a total length of approximately 8 km and a total area of 90 hectares. According to the pollutant concentration measured in the different zones of the site, a different number of injection campaigns and injection frequency has been scheduled (3 to 10 campaigns, every 5 to 12 months). The estimated cost for the bioremediation action is 23 million Euros. Compared to the previous project approved in 2010, including a seafront physical barrier and groundwater circulation wells – in situ well stripping, the in situ injection of the oxygen-releasing compounds is an improvement toward a quicker, more effective and sustainable remediation of groundwater at the site. In view of all this, in 2017 the public authorities approved the variant of the project.File | Dimensione | Formato | |
---|---|---|---|
2_procppr.pdf
accesso aperto
Descrizione: contributo
:
Publisher’s version
Dimensione
372.18 kB
Formato
Adobe PDF
|
372.18 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.