INSPYRE created a user group composed of key customers for the project’s results, which included representatives of the designers of the ESNII reactor concepts (ASTRID, MYRRHA, ALFRED, ALLEGRO), as well as of fuel manufacturers and utilities (ORANO, EDF). A first meeting had been organized in August 2018 to present the INSPYRE approach and activities to the users and discuss their needs in the area covered by INSPYRE activities. The synthesis of the meeting is reported in INSPYRE Deliverable D9.4. Three meetings with the user group were then organised throughout the project to present the approach and results of the project to the Users, get their feedback on these results and discuss follow-up activities. - The Second User Group meeting took place on January 17th, 2020 and was dedicated to the developments made in the fuel performance codes considered in the project and their assessment against the selected fast reactor irradiation experiments - The third User Group meeting was held on May 31st, 2021 and was dedicated to the simulation of the fuel elements in normal operating conditions of the ASTRID reactor concept - The final User Group meeting was organised jointly with the second Scientific Advisory Committee meeting on May 24th, 2022 and concerned the overall scientific outcomes of INSPYRE. The present deliverable reports the presentations made during the meetings and the synthesis of the exchanges that followed.
Synthesis of the presentation of INSPYRE results to the User Group
L. Luzzi;A. Magni;D. Pizzocri;
2023-01-01
Abstract
INSPYRE created a user group composed of key customers for the project’s results, which included representatives of the designers of the ESNII reactor concepts (ASTRID, MYRRHA, ALFRED, ALLEGRO), as well as of fuel manufacturers and utilities (ORANO, EDF). A first meeting had been organized in August 2018 to present the INSPYRE approach and activities to the users and discuss their needs in the area covered by INSPYRE activities. The synthesis of the meeting is reported in INSPYRE Deliverable D9.4. Three meetings with the user group were then organised throughout the project to present the approach and results of the project to the Users, get their feedback on these results and discuss follow-up activities. - The Second User Group meeting took place on January 17th, 2020 and was dedicated to the developments made in the fuel performance codes considered in the project and their assessment against the selected fast reactor irradiation experiments - The third User Group meeting was held on May 31st, 2021 and was dedicated to the simulation of the fuel elements in normal operating conditions of the ASTRID reactor concept - The final User Group meeting was organised jointly with the second Scientific Advisory Committee meeting on May 24th, 2022 and concerned the overall scientific outcomes of INSPYRE. The present deliverable reports the presentations made during the meetings and the synthesis of the exchanges that followed.File | Dimensione | Formato | |
---|---|---|---|
Technical_Report_INSPYRE_WP9-D9.8_(2023).pdf
accesso aperto
Descrizione: Deliverable D9.8 of the INSPYRE Project
:
Publisher’s version
Dimensione
330.68 kB
Formato
Adobe PDF
|
330.68 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.