The present study seeks to demonstrate the feasibility of avoiding the preliminary phase, which is mandatory in all conventional approaches for internal quality control (IQC) management. Apart from savings on the resources consumed by the preliminary phase, the alternative approach described here is able to detect any analytic problems during the startup and provide a foundation for subsequent conventional assessment. A new dynamically updated predictive control chart (PCC) is used. Being Bayesian in concept, it utilizes available prior information. The manufacturer's prior quality control target value, the manufacturer's maximum acceptable interassay coefficient of variation value and the interassay standard deviation value defined during method validation in each laboratory, allow online IQC management. An Excel template, downloadable from journal website, allows easy implementation of this alternative approach in any laboratory. In the practical case of prothrombin percentage measurement, PCC gave no false alarms with respect to the 1(ks) rule (with same 5% false-alarm probability on a single control sample) during an overlap phase between two IQC batches. Moreover, PCCs were as effective as the 1(ks) rule in detecting increases in both random and systematic error after the minimal preliminary phase required by medical biology guidelines. PCCs can improve efficiency in medical biology laboratories.
Use of prior manufacturer specifications with Bayesian logic eludes preliminary phase issues in quality control: An example in a hemostasis laboratory
Tsiamyrtzis P.;
2015-01-01
Abstract
The present study seeks to demonstrate the feasibility of avoiding the preliminary phase, which is mandatory in all conventional approaches for internal quality control (IQC) management. Apart from savings on the resources consumed by the preliminary phase, the alternative approach described here is able to detect any analytic problems during the startup and provide a foundation for subsequent conventional assessment. A new dynamically updated predictive control chart (PCC) is used. Being Bayesian in concept, it utilizes available prior information. The manufacturer's prior quality control target value, the manufacturer's maximum acceptable interassay coefficient of variation value and the interassay standard deviation value defined during method validation in each laboratory, allow online IQC management. An Excel template, downloadable from journal website, allows easy implementation of this alternative approach in any laboratory. In the practical case of prothrombin percentage measurement, PCC gave no false alarms with respect to the 1(ks) rule (with same 5% false-alarm probability on a single control sample) during an overlap phase between two IQC batches. Moreover, PCCs were as effective as the 1(ks) rule in detecting increases in both random and systematic error after the minimal preliminary phase required by medical biology guidelines. PCCs can improve efficiency in medical biology laboratories.File | Dimensione | Formato | |
---|---|---|---|
Use of prior manufacturer specifications with Bayesian logic eludes preliminary phase issues in quality control an example in a hemostasis laboratory.pdf
accesso aperto
:
Publisher’s version
Dimensione
437.25 kB
Formato
Adobe PDF
|
437.25 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.