POZZETTI, ALESSANDRO

POZZETTI, ALESSANDRO  

DIPARTIMENTO DI INGEGNERIA GESTIONALE  

Mostra records
Risultati 1 - 20 di 64 (tempo di esecuzione: 0.034 secondi).
Titolo Data di pubblicazione Autori File
"An Algorithm for Short Term production Planning of Flexible Assembly Systems" 1-gen-1988 BRANDOLESE, ARMANDO MARIO NICOLAGARETTI, MARCOPOZZETTI, ALESSANDRO +
A capacity-driven approach to establish reliable due dates in a MTO environment 1-gen-2004 CORTI, DONATELLAPOZZETTI, ALESSANDRO +
A Conceptual Model of the IT Ecosystem for Asset Management in the Global Manufacturing Context 1-gen-2020 Polenghi A.Roda I.Macchi M.Pozzetti A.
A genetic algorithm for disassembly strategy definition 1-gen-2000 CACCIA, CLAUDIO GIOVANNIPOZZETTI, ALESSANDRO
A Group Technology Quantitative Method for Setup Reduction in PCB Assembly 1-gen-1993 POZZETTI, ALESSANDRO +
A Literature-Based Analysis of the Cyber-Physical Systems Under the Lens of Reconfigurability 1-gen-2018 Alessia NapoleoneMarco MacchiAlessandro Pozzetti
A model for production planning in disassembly centres 1-gen-2004 POZZETTI, ALESSANDROZORZINI, MARTA
Achieving Responsiveness in Small and Medium-sized Enterprises through Assemble To Order Strategy 1-gen-2014 SHOAIB-UL-HASAN, SAYYEDMACCHI, MARCOPOZZETTI, ALESSANDRO +
An Algorithm for the Weekly Production Planning of PCB Flexible Assembly Systems 1-gen-1989 GARETTI, MARCOPOZZETTI, ALESSANDRO +
An analysis of work safety management within a sample of small and medium Italian companies 1-gen-2003 CORTI, DONATELLAPOZZETTI, ALESSANDRO
An Investigation on Implemented Actions to Improve Responsiveness in Manufacturing Firms 1-gen-2017 NAPOLEONE, ALESSIAM. MacchiA. Pozzetti
Bottleneck Scheduling in PCB Assembly 1-gen-1994 POZZETTI, ALESSANDRO +
Conceptual Framework for a Data Model to Support Asset Management Decision-Making Process 1-gen-2019 Polenghi A.Roda I.Macchi M.Pozzetti A.
Core Characteristics of Reconfigurability and their Influencing Elements 1-gen-2018 NAPOLEONE, ALESSIAAlessandro PozzettiMarco Macchi
Data taxonomy to manage information and data in Maintenance Management 1-gen-2020 Polenghi, A.Roda, I.Macchi, M.Pozzetti, A.
Determinazione della capacità produttiva di sistemi flessibili di assemblaggio 1-gen-1988 POZZETTI, ALESSANDRO +
Development and Performance of MCCS Architecture for the Control of Flexible Manufacturing Systems 1-gen-1986 BRANDOLESE, ARMANDO MARIO NICOLAGARETTI, MARCOPOZZETTI, ALESSANDROSIANESI, ANDREA
Development of Production Planning Systems for Flexible Manufacturing and Assembly Systems 1-gen-1987 BRANDOLESE, ARMANDO MARIO NICOLAGARETTI, MARCOPOZZETTI, ALESSANDRO
Due date (DD) quotation and capacity planning inmake-to-order companies: results from an empirical analysis 1-gen-2006 CORTI, DONATELLAPOZZETTI, ALESSANDROZORZINI, MARTA
Evaluation of the impact of plant and production management automation on job-shop manufacturing performances 1-gen-1990 POZZETTI, ALESSANDROSIANESI, ANDREA +