SIANESI, ANDREA
A comparison between traditional methods and new models for computerized production planning
1991-01-01 Sianesi, Andrea
A framework for the Alignment of New Product Development and Supply Chains
2010-01-01 Pero, MARGHERITA EMMA PAOLA; Abdelkafi, N.; Sianesi, Andrea; Blecker, T.
A framework to assess a SC’s readiness to increase responsiveness
2003-01-01 Brun, Alessandro; Sianesi, Andrea
A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setup
1993-01-01 M., Arosio; Sianesi, Andrea
A landscape of Big data analytics in Supply chain planning: completing the puzzle and vision to the future
2019-01-01 Xu, J.; Pero, M.; Ciccullo, F.; Sianesi, A.
A multi-agent application to the mixed-model assembly lines balancing problem
1998-01-01 Caridi, Maria; S., Carnicella; M., Colombo; Sianesi, Andrea
A simulation study on the impacts of product and supply chain modularity on mix flexibility
2012-01-01 Caridi, Maria; Pero, MARGHERITA EMMA PAOLA; Sianesi, Andrea
A system dynamics model for assessing the impact of product modularity on NPD process
2008-01-01 Caridi, Maria; Pero, MARGHERITA EMMA PAOLA; Sianesi, Andrea
Aligning Supply Chain Management and New Product Development: a framework of reference
2006-01-01 Pero, MARGHERITA EMMA PAOLA; Sianesi, Andrea
Aligning Supply Chain Management and New Product Development: a general framework
2007-01-01 Pero, MARGHERITA EMMA PAOLA; Sianesi, Andrea
Aligning Supply Chain Management and New Product Development: A Theoretical Framework
2009-01-01 Pero, MARGHERITA EMMA PAOLA; Sianesi, Andrea
An analysis of the impact of plant and management variables in a multi-stage, mixed-model production system
1998-01-01 Sianesi, Andrea
An empirical investigation on Big data in Supply chains: Case from the Smart Connected Products
2020-01-01 Xu, J.; Ciccullo, F.; Sianesi, A.
An exploratory study of the relation between supply chain topological features and supply chain performance
2010-01-01 Pero, MARGHERITA EMMA PAOLA; Rossi, T.; Noè, C.; Sianesi, Andrea
An improvement of the LP-based Aucamp model for the solution of the multi-item lot sizing capacity-constrained problem
1993-01-01 Sianesi, Andrea; M., Croci; A., Meroni
Analisi dei limiti di applicabilità delle tecniche di gestione della produzione JIT ad un'azienda manifatturiera
1992-01-01 Sianesi, Andrea
Analisi di modelli per l'internazionalizzazione
1994-01-01 R., Iskra; A., Marinoni; A., Portioli; Sianesi, Andrea
Analisi di un sistema di assemblaggio modulare per un'azienda produttrice di elettrodomestici
1992-01-01 L., Gilioli; G., Meschini; Sianesi, Andrea
Analisi sperimentale degli effetti generati su un piano MRP da perturbazioni della domanda
2004-01-01 L., D'Alonzo; FAHMY SALAMA, Kamal; Sianesi, Andrea
Analisi, simulazione e riprogettazione del sistema di trasporto mobili per un'azienda produttrice di elettrodomestici
1991-01-01 G., Puccinelli; M., Schiappapietra; Sianesi, Andrea