Energy and cost assessment of solar photovoltaic (PV) electricity, justified by the economic competition between energy sources, is strongly related to reliable long-term systems performances and actual O&M costs. In this sense, the pilot PV plant at Politecnico di Milano represents the first installation under the national PV Rooftops Programme of Ministry of Environment in Italy and plays a significant role in respect of the promotion and development of photovoltaic technology. The study and the design were made in detail not only to improve system productivity and efficiency, but also in respect of its visibility to illustrate a good example of the integration of photovoltaic into buildings. After eleven years of its operation, the measured data and parameters represent an important benchmark to analyze real benefit and reliability of PV technology.

The first installation under the Italian PV Rooftop Programme: A performance analysis referred to 11 years of operation2013 International Conference on Clean Electrical Power (ICCEP)

ASTE, NICCOLO';DEL PERO, CLAUDIO;LEONFORTE, FABRIZIO
2013-01-01

Abstract

Energy and cost assessment of solar photovoltaic (PV) electricity, justified by the economic competition between energy sources, is strongly related to reliable long-term systems performances and actual O&M costs. In this sense, the pilot PV plant at Politecnico di Milano represents the first installation under the national PV Rooftops Programme of Ministry of Environment in Italy and plays a significant role in respect of the promotion and development of photovoltaic technology. The study and the design were made in detail not only to improve system productivity and efficiency, but also in respect of its visibility to illustrate a good example of the integration of photovoltaic into buildings. After eleven years of its operation, the measured data and parameters represent an important benchmark to analyze real benefit and reliability of PV technology.
2013
2013 International Conference on Clean Electrical Power (ICCEP)
9781467344296
9781467344302
Long-term performance analysis; Performance Ratio; photovoltaic reliability
File in questo prodotto:
File Dimensione Formato  
Paper ADL - P2_5 - ICCEP 13 + copertina.pdf

Accesso riservato

: Post-Print (DRAFT o Author’s Accepted Manuscript-AAM)
Dimensione 2.46 MB
Formato Adobe PDF
2.46 MB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/845944
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 7
  • ???jsp.display-item.citation.isi??? 2
social impact