In order to reach the EU targets 2020 and the RES development, the significant key idea of the incentives should be allowing each technology to a progressive improvement towards the competitiveness or so-called grid parity. In Italy this process has already started, the first results show that the grid parity could be achieved in a few years, even if the presence of possible barriers could be delayed or accelerated the grid parity.

REACHING PV GRID PARITY: LCOE ANALYSIS FOR THE ITALIAN FRAMEWORK

DELFANTI, MAURIZIO;OLIVIERI, VALERIA;
2013-01-01

Abstract

In order to reach the EU targets 2020 and the RES development, the significant key idea of the incentives should be allowing each technology to a progressive improvement towards the competitiveness or so-called grid parity. In Italy this process has already started, the first results show that the grid parity could be achieved in a few years, even if the presence of possible barriers could be delayed or accelerated the grid parity.
2013
22nd International Conference on Electricity Distribution CIRED
978-1-84919-732-8
photovoltaic power systems,power generation economics,power grids,EU,Italian framework,LCOE analysis,PV grid parity,RES development,levelized cost of electricity,renewable energy source
File in questo prodotto:
File Dimensione Formato  
1506_full paper.pdf

Accesso riservato

: Post-Print (DRAFT o Author’s Accepted Manuscript-AAM)
Dimensione 397.85 kB
Formato Adobe PDF
397.85 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/740989
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 8
  • ???jsp.display-item.citation.isi??? ND
social impact