A multiobjective programming analysis of the operations ofthe Aswân High Dam is developed using an historical sequence (1871 - 1976) of monthly inflows as inputs to a simulation process. The trade-offs between hydroelectric energy generation, agricultural water needs, and environmental degradation from river scouring are examined. Production of short-term (three to four months) peak hydropower output is also evaluated.

Energy, agriculture, and water: a multiobjective programming analysis of the operations of the Aswân High Dam

GUARISO, GIORGIO;
1980-01-01

Abstract

A multiobjective programming analysis of the operations ofthe Aswân High Dam is developed using an historical sequence (1871 - 1976) of monthly inflows as inputs to a simulation process. The trade-offs between hydroelectric energy generation, agricultural water needs, and environmental degradation from river scouring are examined. Production of short-term (three to four months) peak hydropower output is also evaluated.
1980
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/666513
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact