The planning of preventive measures before, during and after flooding in a specific target region such as the European Union requires strategic planning of the legal basis at the earliest possible stage. Interventions made after a flood must avoid worsening the damage to cultural heritage. Some recommendations and best practice advice for moveable objects and buildings are presented.

After the flood (CHEF Chapter 3, Paragr. 3.3)

BINDA, LUIGIA;CARDANI, GIULIANA
2011-01-01

Abstract

The planning of preventive measures before, during and after flooding in a specific target region such as the European Union requires strategic planning of the legal basis at the earliest possible stage. Interventions made after a flood must avoid worsening the damage to cultural heritage. Some recommendations and best practice advice for moveable objects and buildings are presented.
2011
CHEF – Cultural HEritage protection against Flooding
9788086246376
Flood; damage; cultural heritage; recommended procedure; restoration; emergency action
File in questo prodotto:
File Dimensione Formato  
CHEF-3-3_ Binda_After the Flood.pdf

Accesso riservato

: Post-Print (DRAFT o Author’s Accepted Manuscript-AAM)
Dimensione 1.05 MB
Formato Adobe PDF
1.05 MB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/617901
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact