Among the innovative contributions to electric distribution systems, one of the most promising and qualified is the possibility to manage and control distributed generation. Therefore, the latest distribution management systems tend to incorporate optimization functions for the short-term scheduling of the various energy and control resources available in the network (e. g., embedded generators, reactive power compensators and transformers equipped with on-load tap changers). The short-term scheduling procedure adopted in the paper is composed by two stages: a day-ahead scheduler for the optimization of distributed resources production during the following day, an intra-day scheduler that every 15 min adjusts the scheduling in order to take into account the operation requirements and constraints of the distribution network. The intra-day scheduler solves a non-linear multi-objective optimization problem by iteratively applying a mixed-integer linear programming (MILP) algorithm. The linearization of the optimization function and the constraints is achieved by the use of sensitivity coefficients obtained from the results of a three-phase power flow calculation. The paper shows the application of the proposed approach to a medium-voltage 120 buses network with five wind plants, one photovoltaic field, ten dispatchable generators, and two transformers equipped with on-load tap changers.

Short-Term Scheduling and Control of Active Distribution Systems With High Penetration of Renewable Resources

GRILLO, SAMUELE;
2010-01-01

Abstract

Among the innovative contributions to electric distribution systems, one of the most promising and qualified is the possibility to manage and control distributed generation. Therefore, the latest distribution management systems tend to incorporate optimization functions for the short-term scheduling of the various energy and control resources available in the network (e. g., embedded generators, reactive power compensators and transformers equipped with on-load tap changers). The short-term scheduling procedure adopted in the paper is composed by two stages: a day-ahead scheduler for the optimization of distributed resources production during the following day, an intra-day scheduler that every 15 min adjusts the scheduling in order to take into account the operation requirements and constraints of the distribution network. The intra-day scheduler solves a non-linear multi-objective optimization problem by iteratively applying a mixed-integer linear programming (MILP) algorithm. The linearization of the optimization function and the constraints is achieved by the use of sensitivity coefficients obtained from the results of a three-phase power flow calculation. The paper shows the application of the proposed approach to a medium-voltage 120 buses network with five wind plants, one photovoltaic field, ten dispatchable generators, and two transformers equipped with on-load tap changers.
2010
File in questo prodotto:
File Dimensione Formato  
IEEE Systems Journal Scheduling.pdf

Accesso riservato

: Post-Print (DRAFT o Author’s Accepted Manuscript-AAM)
Dimensione 887.36 kB
Formato Adobe PDF
887.36 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/574636
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 237
  • ???jsp.display-item.citation.isi??? 177
social impact