The paper focuses on a cable-stayed bridge recently erected about 60 km far from Milan, in the Province of Lecco. After the description of the main characteristics and the construction phases of the bridge, the paper presents the most relevant results obtained from the bridge reception tests, including extensive characterization of the materials, load tests and ambient vibration tests.

Construction phases and reception tests of the new cable-stayed bridge over the Adda river (Northern Italy)

GENTILE, CARMELO;
2010-01-01

Abstract

The paper focuses on a cable-stayed bridge recently erected about 60 km far from Milan, in the Province of Lecco. After the description of the main characteristics and the construction phases of the bridge, the paper presents the most relevant results obtained from the bridge reception tests, including extensive characterization of the materials, load tests and ambient vibration tests.
2010
Proceedings 34th Int. Symposium on Bridge and Structural Engineeering
File in questo prodotto:
File Dimensione Formato  
A-599.pdf

Accesso riservato

: Post-Print (DRAFT o Author’s Accepted Manuscript-AAM)
Dimensione 891.58 kB
Formato Adobe PDF
891.58 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/571056
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact