The effectiveness of the SS-SBR (Soil Slurry - Sequencing Batch Reactor) process for the remediation of soils contaminated by several organic pollutants has been evaluated. Experimental tests have been performed on two different soils, a spiked one and an industrial aged soil. The spiked soil, artificially contaminated, has been prepared trying to simulate the pollution of an industrial aged soil in terms of number and kind of contaminants. PAHs (Polycyclic Aromatic Hydrocarbons) and phenols degradation has been particularly investigated because they are considered persistent and recalcitrant. Concerning the spiked soil, removal efficiencies higher than 95% in 6 to 9 weeks have been found for all the pollutants, except for five-rings PAHs; however, these compounds were partly removed in I I to 13 weeks. Good results have been achieved also for the industrial aged soil with a maximum removal of about 80% in 7-8 weeks. To enhance the pollutants degradation, trying to obtain a faster remediation, the biological treatment has been combined with a chemical oxidation with ozone. The best degradation effectiveness of the combined process has been obtained applying the ozonation after few days of the biological treatment.
Biodegradation combined with ozone for the remediation of contaminated soils
DERUDI, MARCO;NANO, GIUSEPPE;ROTA, RENATO
2007-01-01
Abstract
The effectiveness of the SS-SBR (Soil Slurry - Sequencing Batch Reactor) process for the remediation of soils contaminated by several organic pollutants has been evaluated. Experimental tests have been performed on two different soils, a spiked one and an industrial aged soil. The spiked soil, artificially contaminated, has been prepared trying to simulate the pollution of an industrial aged soil in terms of number and kind of contaminants. PAHs (Polycyclic Aromatic Hydrocarbons) and phenols degradation has been particularly investigated because they are considered persistent and recalcitrant. Concerning the spiked soil, removal efficiencies higher than 95% in 6 to 9 weeks have been found for all the pollutants, except for five-rings PAHs; however, these compounds were partly removed in I I to 13 weeks. Good results have been achieved also for the industrial aged soil with a maximum removal of about 80% in 7-8 weeks. To enhance the pollutants degradation, trying to obtain a faster remediation, the biological treatment has been combined with a chemical oxidation with ozone. The best degradation effectiveness of the combined process has been obtained applying the ozonation after few days of the biological treatment.File | Dimensione | Formato | |
---|---|---|---|
Biodegradation combined with ozone for the remediation.pdf
Accesso riservato
:
Altro materiale allegato
Dimensione
337.47 kB
Formato
Adobe PDF
|
337.47 kB | Adobe PDF | Visualizza/Apri |
Biodegradation combined with ozone for the remediation of contamined soils_11311-552188_Rota.pdf
accesso aperto
:
Post-Print (DRAFT o Author’s Accepted Manuscript-AAM)
Dimensione
281.81 kB
Formato
Adobe PDF
|
281.81 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.