This study describes the technical and economic aspects of the repowering process for the wind farms in Bustelo and S. Xoán, situated in the municipalities of Muras (Lugo) and As Pontes de García Rodríguez (A Coruña), Galicia, North-Western Spain. This process was the result of a growing demand for renewable energies, facilitated by the great potential of wind energy for Galicia . Both farms were set up in 1998. The other factors they have in common - the same type of machinery, their location and a shared substation- mean they can be studied together and independently.

Technical and economic study of two repowered wind farms in Bustelo and San Xoán, 24.7 MW and 15.84 MW respectively

PIEGARI, LUIGI
2009-01-01

Abstract

This study describes the technical and economic aspects of the repowering process for the wind farms in Bustelo and S. Xoán, situated in the municipalities of Muras (Lugo) and As Pontes de García Rodríguez (A Coruña), Galicia, North-Western Spain. This process was the result of a growing demand for renewable energies, facilitated by the great potential of wind energy for Galicia . Both farms were set up in 1998. The other factors they have in common - the same type of machinery, their location and a shared substation- mean they can be studied together and independently.
2009
Proceedings of International Conference on Clean Electrical Power
9781424425440
wind power; elettrici
File in questo prodotto:
File Dimensione Formato  
iccep_filgueira_piegari.pdf

Accesso riservato

: Post-Print (DRAFT o Author’s Accepted Manuscript-AAM)
Dimensione 754.06 kB
Formato Adobe PDF
754.06 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/545194
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 18
  • ???jsp.display-item.citation.isi??? 0
social impact