The widespread adoption of solid oxide electrolysis (SOE) is constrained by limited manufacturing scale and high costs. The Horizon Europe project OUTFOX addresses these barriers by developing and testing thinner (<400 μm) and larger (up to 900 cm2) cells, alongside advanced stack and module assembly solutions, targeting ambitious goals in hydrogen production costs and life-cycle CO2 emissions. This work presents a techno-economic analysis of a multi-MW SOE plant, spanning from detailed process modeling to levelized cost of hydrogen (LCOH) estimation. A process model built in Aspen Plus® sizes the system and derives performance metrics across configurations with different levels of internal heat integration. A bottom-up Capex estimation is then performed, leveraging process simulation outputs. Internal heat recovery reduces the external heat demand, including that for steam generation, though only 13% of the evaporation load can be met internally. Despite increased complexity, these configurations introduce only marginal Capex increases. The uninstalled system cost is dominated by the rectifier, the H2 compressor, and high-temperature recuperators, with low-temperature BoP playing a secondary role. Scaling up the hot-box capacity, through larger cells or taller stacks, reduces specific uninstalled Capex by more than 45% (from 515 to 279 €/kWe), meeting SRIA targets for high-temperature electrolysis. The SRIA target on hydrogen cost (3 €/kg) is approachable at high capacity factors and low electricity prices (40 €/MWh), and becomes accessible even at modest capacity factors (50%) with a scaled-up SOE unit.
Techno-economic analysis of modular SOE systems: scale-up effects on Capex and hydrogen cost
Marco Ficili;Stefano Campanari;Paolo Colbertaldo
2026-01-01
Abstract
The widespread adoption of solid oxide electrolysis (SOE) is constrained by limited manufacturing scale and high costs. The Horizon Europe project OUTFOX addresses these barriers by developing and testing thinner (<400 μm) and larger (up to 900 cm2) cells, alongside advanced stack and module assembly solutions, targeting ambitious goals in hydrogen production costs and life-cycle CO2 emissions. This work presents a techno-economic analysis of a multi-MW SOE plant, spanning from detailed process modeling to levelized cost of hydrogen (LCOH) estimation. A process model built in Aspen Plus® sizes the system and derives performance metrics across configurations with different levels of internal heat integration. A bottom-up Capex estimation is then performed, leveraging process simulation outputs. Internal heat recovery reduces the external heat demand, including that for steam generation, though only 13% of the evaporation load can be met internally. Despite increased complexity, these configurations introduce only marginal Capex increases. The uninstalled system cost is dominated by the rectifier, the H2 compressor, and high-temperature recuperators, with low-temperature BoP playing a secondary role. Scaling up the hot-box capacity, through larger cells or taller stacks, reduces specific uninstalled Capex by more than 45% (from 515 to 279 €/kWe), meeting SRIA targets for high-temperature electrolysis. The SRIA target on hydrogen cost (3 €/kg) is approachable at high capacity factors and low electricity prices (40 €/MWh), and becomes accessible even at modest capacity factors (50%) with a scaled-up SOE unit.| File | Dimensione | Formato | |
|---|---|---|---|
|
EFCF-2026_A0912_Paper_11844_Marco.pdf
accesso aperto
Descrizione: conference paper
:
Publisher’s version
Dimensione
281.63 kB
Formato
Adobe PDF
|
281.63 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.



