The rapid growth of digital services is creating a new and uncertain electricity load from data centres. In Italy, grid connection requests are approaching 100 GWe, with strong regional concentration and limited information on actual deployment and timing. This may become a demand shock, thus raising a system-level question: can a large, spatially clustered increase in the electric load alter the cost-optimal evolution of the energy system towards decarbonisation? We address this question with FENICE (Future Energy traNsition multI-seCtor modEl), a long-term energy system model that co-optimises investment and operation across the time horizon of the transition, to meet demand at minimum total system cost under decarbonisation constraints. Data centres are represented as an exogenous electricity demand term, under alternative assumptions on magnitude, timing, and regional distribution, consistently with the observed connection requests. The model endogenously adapts generation and flexibility options, such as renewables, dispatchable capacity, storage, and carbon capture, while accounting for interactions with electricity and gas/hydrogen networks. Results indicate that additional data-centre electricity demand mainly amplifies investment requirements already implied by net-zero pathways, without triggering a qualitatively different transition. Outcomes are particularly sensitive to network constraints: the expansion of electricity grid and hydrogen infrastructure can accommodate new concentrated demand, reduce the need for local firm generation, and limit system costs. Across the investigated cases, substantial renewable build-out remains central to the least-cost mix, while low carbon firm resources and flexibility options play complementary roles. Overall, the findings suggest that preparing for data-centre growth requires prioritising grid planning and system integration. The timing and location of new loads affect optimal investments, and the system response is shaped by energy transport across regions.

Integrating Data-centre Load Growth in Energy System Optimisation: Effects on the Generation Mix and Energy Networks

Catania, Matteo;Fattori, Fabrizio;Colbertaldo, Paolo
2026-01-01

Abstract

The rapid growth of digital services is creating a new and uncertain electricity load from data centres. In Italy, grid connection requests are approaching 100 GWe, with strong regional concentration and limited information on actual deployment and timing. This may become a demand shock, thus raising a system-level question: can a large, spatially clustered increase in the electric load alter the cost-optimal evolution of the energy system towards decarbonisation? We address this question with FENICE (Future Energy traNsition multI-seCtor modEl), a long-term energy system model that co-optimises investment and operation across the time horizon of the transition, to meet demand at minimum total system cost under decarbonisation constraints. Data centres are represented as an exogenous electricity demand term, under alternative assumptions on magnitude, timing, and regional distribution, consistently with the observed connection requests. The model endogenously adapts generation and flexibility options, such as renewables, dispatchable capacity, storage, and carbon capture, while accounting for interactions with electricity and gas/hydrogen networks. Results indicate that additional data-centre electricity demand mainly amplifies investment requirements already implied by net-zero pathways, without triggering a qualitatively different transition. Outcomes are particularly sensitive to network constraints: the expansion of electricity grid and hydrogen infrastructure can accommodate new concentrated demand, reduce the need for local firm generation, and limit system costs. Across the investigated cases, substantial renewable build-out remains central to the least-cost mix, while low carbon firm resources and flexibility options play complementary roles. Overall, the findings suggest that preparing for data-centre growth requires prioritising grid planning and system integration. The timing and location of new loads affect optimal investments, and the system response is shaped by energy transport across regions.
2026
Proceedings of ATI Annual Congress 2026
File in questo prodotto:
File Dimensione Formato  
JPCS_3351_1_012054.pdf

accesso aperto

Descrizione: conference paper
: Publisher’s version
Dimensione 311.23 kB
Formato Adobe PDF
311.23 kB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1333465
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex ND
social impact