The selection of renewable energy technologies is widely based on the economic index levelized cost of electricity (LCOE). However, the LCOE ignores the potential temporal mismatch between electricity generation and actual grid demand: this aspect is accounted for in the new index named actual cost of electricity (ACOE), here proposed. This index provides a more accurate economic assessment of renewable energy, minimizing the number of assumptions to be made and outlining the benefits of including a storage. The proposed index is tested across ten cases encompassing three renewable technologies: wind, photovoltaic, and concentrated solar power. The outcomes show that the actual renewable electricity generation of a plant can be reduced by 40%–50% when accounting for the actual electricity demand, resulting in an ACOE exceeding the LCOE by up to 100/150 $/MWh. In addition, the ACOE enables the identification of breakthrough conditions that make storage adoption economically feasible.

Actual cost of electricity: An economic index to overcome levelized cost of electricity limits

Manzolini, Giampaolo;Binotti, Marco;Gentile, Giancarlo;Pilotti, Lorenzo;
2024-01-01

Abstract

The selection of renewable energy technologies is widely based on the economic index levelized cost of electricity (LCOE). However, the LCOE ignores the potential temporal mismatch between electricity generation and actual grid demand: this aspect is accounted for in the new index named actual cost of electricity (ACOE), here proposed. This index provides a more accurate economic assessment of renewable energy, minimizing the number of assumptions to be made and outlining the benefits of including a storage. The proposed index is tested across ten cases encompassing three renewable technologies: wind, photovoltaic, and concentrated solar power. The outcomes show that the actual renewable electricity generation of a plant can be reduced by 40%–50% when accounting for the actual electricity demand, resulting in an ACOE exceeding the LCOE by up to 100/150 $/MWh. In addition, the ACOE enables the identification of breakthrough conditions that make storage adoption economically feasible.
2024
Economics
Electrical system
Energy policy
Social sciences
File in questo prodotto:
File Dimensione Formato  
1-s2.0-S2589004224011192-main-3.pdf

accesso aperto

: Publisher’s version
Dimensione 3.33 MB
Formato Adobe PDF
3.33 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1288333
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? 1
social impact