This paper proposes a coordinated scheduling method for a hydrogen-integrated multi-energy district (HMED) to realize the effective, profitable, and green operation of HMED. A joint market mechanism including capacity, energy, and ancillary service markets is developed considering the coordination of annual and daily decisions of HMED. A hybrid hydrogen storage system including both daily and seasonal hydrogen storages is modeled to achieve intraday and cross-seasonal peak shaving. It is proved by case studies that the proposed coordinated scheduling method can improve the economy of and the flexibility and capacity adequacy provided by HMED, moreover, it can optimize the integration of hydrogen facilities.

Coordinated Scheduling Method of Hydrogen- Integrated Multi-Energy District in Joint Market Mechanism

Ilea V.;Bovo C.
2024-01-01

Abstract

This paper proposes a coordinated scheduling method for a hydrogen-integrated multi-energy district (HMED) to realize the effective, profitable, and green operation of HMED. A joint market mechanism including capacity, energy, and ancillary service markets is developed considering the coordination of annual and daily decisions of HMED. A hybrid hydrogen storage system including both daily and seasonal hydrogen storages is modeled to achieve intraday and cross-seasonal peak shaving. It is proved by case studies that the proposed coordinated scheduling method can improve the economy of and the flexibility and capacity adequacy provided by HMED, moreover, it can optimize the integration of hydrogen facilities.
2024
2024 9th International Conference on Power and Renewable Energy, ICPRE 2024
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1281553
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact