Flexible manufacturing systems (FMSs) are expected to provide flexibility and efficiency to satisfy the needs of high-variety production of low-volumes. On the other hand, in the current global market competition and energy crisis, reducing energy consumption while maintaining high and flexible productivity is a big challenge for the manufacturing industry. In this paper, a framework for FMS energy-efficient scheduling is proposed. A specific type of petri net model i.e., timed & energy transition petri net (TETPN), is developed for modelling the dynamic production process of FMSs. A TETPN enables model both time and energy characteristics of production operations during manufacturing. A step-wise heuristic algorithm based on hybrid beam search is modified for generating the reachability graph of TETPN. Then an energy-efficient schedule is obtained using the proposed framework. A study case of an FMS producing different types of products is adopted to illustrate the proposed methodology. The results show the efficiency of energy-efficient scheduling of FMSs can, indeed, be achieved.

Energy-Efficient Scheduling of Flexible Manufacturing Systems Based on Petri Net

Chen M.;Zio E.
2023-01-01

Abstract

Flexible manufacturing systems (FMSs) are expected to provide flexibility and efficiency to satisfy the needs of high-variety production of low-volumes. On the other hand, in the current global market competition and energy crisis, reducing energy consumption while maintaining high and flexible productivity is a big challenge for the manufacturing industry. In this paper, a framework for FMS energy-efficient scheduling is proposed. A specific type of petri net model i.e., timed & energy transition petri net (TETPN), is developed for modelling the dynamic production process of FMSs. A TETPN enables model both time and energy characteristics of production operations during manufacturing. A step-wise heuristic algorithm based on hybrid beam search is modified for generating the reachability graph of TETPN. Then an energy-efficient schedule is obtained using the proposed framework. A study case of an FMS producing different types of products is adopted to illustrate the proposed methodology. The results show the efficiency of energy-efficient scheduling of FMSs can, indeed, be achieved.
2023
2023 7th International Conference on System Reliability and Safety, ICSRS 2023
979-8-3503-0605-7
energy efficiency
flexible manufacturing system
hybrid beam search
petri net g
scheduling
File in questo prodotto:
File Dimensione Formato  
Energy-Efficient_Scheduling_of_Flexible_Manufacturing_Systems_Based_on_Petri_Net.pdf

Accesso riservato

: Publisher’s version
Dimensione 694.35 kB
Formato Adobe PDF
694.35 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1260246
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
social impact