This study presents the techno-economic assessment of four electrified cement plants: i) using direct electrification and plasma technologies (eC-pK case); ii) consisting of indirect electrification via H2 combustion and oxycombustion of alternative fuels (OC-HK); iii) combining direct electrification, alternative fuels combustion and post-combustion CO2 capture (eC-afK); iv) consisting in the electrification of the hydraulic Calcium Hydro Silicate production process (e-hCHS). Process modeling in Aspen Plus is used to estimate mass and energy balances and calculate techno-economic key performance indicators. The study finds that all the electrified alternatives achieve high levels of equivalent CO2 emissions avoidance (87.2%-101.8%), with a trade-off between the electricity demand (604-1341 kWh/tclk) and the amount of captured CO2 to be handled by the transport & storage infrastructure (357-834 kgCO2/tclk). With an electricity price of 50 euro/MWh, the partially electrified alternatives (OC-HK, eC-afK) showed competitive additional cost of clinker (87 euro/tclk) and cost of avoided CO2 (101 euro/tCO2) against a benchmark case, though higher than the cost of the best CO2 capture technologies from the literature. The eC-pK case resulted in lower economic performance associated mainly to the higher price of electricity per unit of final energy supplied compared to alternative fuels.

Decarbonization of cement production by electrification

Quevedo Parra, Sebastian;Romano, Matteo C.
2023-01-01

Abstract

This study presents the techno-economic assessment of four electrified cement plants: i) using direct electrification and plasma technologies (eC-pK case); ii) consisting of indirect electrification via H2 combustion and oxycombustion of alternative fuels (OC-HK); iii) combining direct electrification, alternative fuels combustion and post-combustion CO2 capture (eC-afK); iv) consisting in the electrification of the hydraulic Calcium Hydro Silicate production process (e-hCHS). Process modeling in Aspen Plus is used to estimate mass and energy balances and calculate techno-economic key performance indicators. The study finds that all the electrified alternatives achieve high levels of equivalent CO2 emissions avoidance (87.2%-101.8%), with a trade-off between the electricity demand (604-1341 kWh/tclk) and the amount of captured CO2 to be handled by the transport & storage infrastructure (357-834 kgCO2/tclk). With an electricity price of 50 euro/MWh, the partially electrified alternatives (OC-HK, eC-afK) showed competitive additional cost of clinker (87 euro/tclk) and cost of avoided CO2 (101 euro/tCO2) against a benchmark case, though higher than the cost of the best CO2 capture technologies from the literature. The eC-pK case resulted in lower economic performance associated mainly to the higher price of electricity per unit of final energy supplied compared to alternative fuels.
2023
File in questo prodotto:
File Dimensione Formato  
2023 - Quevedo, Romano.pdf

accesso aperto

Descrizione: Paper
: Publisher’s version
Dimensione 4.74 MB
Formato Adobe PDF
4.74 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1250857
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 33
  • ???jsp.display-item.citation.isi??? 30
social impact