A pilot plant for high temperature heat pumps (HTHP’s) combined with high temperature mine thermal energy storage (HT-MTES) is developed at the Fraunhofer IEG location of Bochum. The aim of the plant is to inject renewable heat into the district heating (DH) grid. The HT-MTES is a seasonal thermal storage: heat is injected during the summer and successively extracted during the cold season. A HTHP, hydraulically connected to the storage, transfers heat to the DH grid
Development of a pilot site for high temperature heat pumps, with high temperature mine thermal energy storage as heat source
Arianna Passamonti;Paola Bombarda;
2022-01-01
Abstract
A pilot plant for high temperature heat pumps (HTHP’s) combined with high temperature mine thermal energy storage (HT-MTES) is developed at the Fraunhofer IEG location of Bochum. The aim of the plant is to inject renewable heat into the district heating (DH) grid. The HT-MTES is a seasonal thermal storage: heat is injected during the summer and successively extracted during the cold season. A HTHP, hydraulically connected to the storage, transfers heat to the DH gridFile in questo prodotto:
File | Dimensione | Formato | |
---|---|---|---|
Passamonti-Development-of-a-pilot-site-for-high-temperature-heat-pumps-with-high-temperature-mine-thermal_ExtAbstract.pdf
accesso aperto
:
Publisher’s version
Dimensione
1.04 MB
Formato
Adobe PDF
|
1.04 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.