The main goal of this work is to perform a preliminary analysis about the feasibility and implications of the ongoing Full Electric project implemented by ATM, the public company that manages the collective transport in Milan (Italy). The project aims to upgrade the bus system by creating a fleet composed by 1150 full electric buses by 2030 (Scenario 1). In addition to that, a second goal is to analyze the convenience of anticipating the full electrification of the fleet in 2026 (Scenario 2), when the Winter Olympic Games will take place in Italy in Milan and Cortina. In order to perform this analysis satisfactorily cost analysis of the project is described. In particular, all the expenses with respect to both scenarios are calculated and compared to the hypothetical situation in which no project (Scenario 0) is carried out. In this way, it is possible to estimate the incremental expenses that these projects would imply during the years. Within this paper, these aspects are presented: investment and sensitivity analysis.

Transformation of an existing urban bus line: Milan Full Electric project

F. Borghetti;M. Longo;R. Mazzoncini;C. Somaschini
2022-01-01

Abstract

The main goal of this work is to perform a preliminary analysis about the feasibility and implications of the ongoing Full Electric project implemented by ATM, the public company that manages the collective transport in Milan (Italy). The project aims to upgrade the bus system by creating a fleet composed by 1150 full electric buses by 2030 (Scenario 1). In addition to that, a second goal is to analyze the convenience of anticipating the full electrification of the fleet in 2026 (Scenario 2), when the Winter Olympic Games will take place in Italy in Milan and Cortina. In order to perform this analysis satisfactorily cost analysis of the project is described. In particular, all the expenses with respect to both scenarios are calculated and compared to the hypothetical situation in which no project (Scenario 0) is carried out. In this way, it is possible to estimate the incremental expenses that these projects would imply during the years. Within this paper, these aspects are presented: investment and sensitivity analysis.
2022
New scenarios for safe mobility in urban areasProceedings of the XXV International Conference Living and Walking in Cities (LWC 2021), September 9-10, 2021, Brescia, Italy
Urban line, Electric bus fleet, Transportation planning, Sustainable mobility, Transport Economics, Electromobility, Electric vehicles, Zero-emission buses, Sustainable transport, Transport management
File in questo prodotto:
File Dimensione Formato  
1-s2.0-S2352146521009121-main.pdf

accesso aperto

: Publisher’s version
Dimensione 884.68 kB
Formato Adobe PDF
884.68 kB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1195102
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 5
  • ???jsp.display-item.citation.isi??? ND
social impact