Information Modelling and Management (IMM) methods for Most Economically Advantageous Tender (MEAT) can promote the adoption of environmentally sustainable practices. Despite the wide regulatory framework and existing drivers, Construction and Demolition Waste (CDW) trends are still growing. The literature review analyzed IMM and CDW management implementation during design phases although few studies focused on Green Public Procurement (GPP) and CDW management integration from the Public Client’s point of view. This research aims at investigating the integration and efficiency of MEAT and IMM to promote the application of sustainable strategies focused on waste reduction and resource valorization. The study investigates the Public Client’s role in promoting sustainable practices, introducing digital material inventory and BIM during the design phases, and including environmental award criteria in the call for tender documents. A Design Build (DB) procurement model was considered in the case study of a brownfield renovation and the construction of a new school in northern Italy. The methodology provided the Public Client and included a method to evaluate the environmental impact of the bids, allowing for proper selective demolition planning, CDW decrease, and organization while promoting their integration in companies’ expertise and procedures. The replicability of the methodology is demonstrated by positive results of present and previous case studies.

Information Modelling Management and Green Public Procurement for Waste Management and Environmental Renovation of Brownfields

Pellegrini, Laura;Locatelli, Mirko;Meschini, Silvia;Pattini, Giulia;Seghezzi, Elena;Tagliabue, Lavinia Chiara;Di Giuda, Giuseppe Martino
2021-01-01

Abstract

Information Modelling and Management (IMM) methods for Most Economically Advantageous Tender (MEAT) can promote the adoption of environmentally sustainable practices. Despite the wide regulatory framework and existing drivers, Construction and Demolition Waste (CDW) trends are still growing. The literature review analyzed IMM and CDW management implementation during design phases although few studies focused on Green Public Procurement (GPP) and CDW management integration from the Public Client’s point of view. This research aims at investigating the integration and efficiency of MEAT and IMM to promote the application of sustainable strategies focused on waste reduction and resource valorization. The study investigates the Public Client’s role in promoting sustainable practices, introducing digital material inventory and BIM during the design phases, and including environmental award criteria in the call for tender documents. A Design Build (DB) procurement model was considered in the case study of a brownfield renovation and the construction of a new school in northern Italy. The methodology provided the Public Client and included a method to evaluate the environmental impact of the bids, allowing for proper selective demolition planning, CDW decrease, and organization while promoting their integration in companies’ expertise and procedures. The replicability of the methodology is demonstrated by positive results of present and previous case studies.
2021
File in questo prodotto:
File Dimensione Formato  
sustainability-13-08585.pdf

accesso aperto

: Publisher’s version
Dimensione 5.3 MB
Formato Adobe PDF
5.3 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1181905
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 13
  • ???jsp.display-item.citation.isi??? 2
social impact