The paper describes the events that led, in November 2019, to a local blackout in Trentino-Alto Adige (Northern Italy). The events were caused by a heavy snowstorm that resulted in about 7000 faults on the electric system for short-circuits, trees falling on electrical lines etc. In consequence, a 132 kV portion of the grid, and the underlying MV/LV distribution grid, remained isolated from the national transmission grid a part of the 132 kV power system. Overall, approximately 25 thousand customers were involved in a local blackout for more than 24 hours. However, the blackout has been mitigated by the attempts of operating the local system as an electric island, exploiting the black start capability of hydro power plants with enough power capacity to supply the island resulting from the disconnection. The paper describes the main features of the island operation, the main problems encountered until the final restoration, the lessons learned and provides a set of suggestions in order to mitigate the effects of such heavy weather phenomena in the future.

Islanding Operation During the 2019 Alto Adige Snowstorm Emergency

Berizzi, Alberto;Falabretti, Davide;
2020-01-01

Abstract

The paper describes the events that led, in November 2019, to a local blackout in Trentino-Alto Adige (Northern Italy). The events were caused by a heavy snowstorm that resulted in about 7000 faults on the electric system for short-circuits, trees falling on electrical lines etc. In consequence, a 132 kV portion of the grid, and the underlying MV/LV distribution grid, remained isolated from the national transmission grid a part of the 132 kV power system. Overall, approximately 25 thousand customers were involved in a local blackout for more than 24 hours. However, the blackout has been mitigated by the attempts of operating the local system as an electric island, exploiting the black start capability of hydro power plants with enough power capacity to supply the island resulting from the disconnection. The paper describes the main features of the island operation, the main problems encountered until the final restoration, the lessons learned and provides a set of suggestions in order to mitigate the effects of such heavy weather phenomena in the future.
2020
2020 AEIT International Annual Conference (AEIT)
978-8-8872-3747-4
Blackout, Resilience, Black-start, Islanding operation
File in questo prodotto:
File Dimensione Formato  
09241143.pdf

Accesso riservato

Descrizione: Paper
: Publisher’s version
Dimensione 278.21 kB
Formato Adobe PDF
278.21 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1150368
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
social impact