In current design practice post - installed rebars are widely used in structural applications. Their design rules are limited by international codes to the performance of the corresponding cast-in reinforcement bars, albeit they show a higher bond strength. Moreover, the use of straight bars is definitely forbidden in dissipation zone such as beam-to-column joints. The presented paper is intended to assess the performance of cast-in and post-installed rebars designed according to reference codes under the application of cyclic and monotonic loads. To this purpose, experimental tests using a modified beam-end specimen were performed. Two different diameters were selected (db = 12, 16 mm); bonding lengths were determined to account for the promotion of steel failure. Cyclic tests were conducted by applying a repeated stepwise increasing load history (up to fifty-nine repetitions), adapted from test protocols used in the seismic assessment of post-installed anchors.

Comparison of post-installed and cast-in rebars under monotonic and cyclic loads

Marchisella A.;Muciaccia G.
2018-01-01

Abstract

In current design practice post - installed rebars are widely used in structural applications. Their design rules are limited by international codes to the performance of the corresponding cast-in reinforcement bars, albeit they show a higher bond strength. Moreover, the use of straight bars is definitely forbidden in dissipation zone such as beam-to-column joints. The presented paper is intended to assess the performance of cast-in and post-installed rebars designed according to reference codes under the application of cyclic and monotonic loads. To this purpose, experimental tests using a modified beam-end specimen were performed. Two different diameters were selected (db = 12, 16 mm); bonding lengths were determined to account for the promotion of steel failure. Cyclic tests were conducted by applying a repeated stepwise increasing load history (up to fifty-nine repetitions), adapted from test protocols used in the seismic assessment of post-installed anchors.
2018
Proceedings of the 12th fib International PhD Symposium in Civil Engineering
978-80-01-06401-6
File in questo prodotto:
File Dimensione Formato  
338.Marchisella.pdf

Accesso riservato

: Publisher’s version
Dimensione 4.28 MB
Formato Adobe PDF
4.28 MB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1126770
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
social impact