Mismatches between forecasted and actual costs and traffic figures are common in transport investments, especially in large scale ones, and so are delusions of the future demand. High-speed rail projects are often among the worst practices for cost overruns and demand overestimation, even where traffic figures may tell a history of apparent success. In the paper, we analyse two significant cases of delusions of success, namely the Italian and Spanish HSR programmes. The Italian one shows excellent demand performances, but is among the continent's worst cases for construction costs. The Spanish one, recognised worldwide as one of the most successful outcomes of HS policy, is the one where potential demand estimations were systematically neglected, and the planned network appears largely out-of-scale compared to actual traffic. In both cases, the forecasts were not simply biased, as well-known literature on megaproject failures has clearly shown: Italian lines were deliberately designed to increase the cost, and the Spanish network was deliberately planned out-of-scale. By means of the two cases, the paper will show that the core of the problem does not lie in the wrong estimations, but in deliberate choices of overinvestment, overdesign and overquality.

Delusions of success: Costs and demand of high-speed rail in Italy and Spain

Beria P.;
2018-01-01

Abstract

Mismatches between forecasted and actual costs and traffic figures are common in transport investments, especially in large scale ones, and so are delusions of the future demand. High-speed rail projects are often among the worst practices for cost overruns and demand overestimation, even where traffic figures may tell a history of apparent success. In the paper, we analyse two significant cases of delusions of success, namely the Italian and Spanish HSR programmes. The Italian one shows excellent demand performances, but is among the continent's worst cases for construction costs. The Spanish one, recognised worldwide as one of the most successful outcomes of HS policy, is the one where potential demand estimations were systematically neglected, and the planned network appears largely out-of-scale compared to actual traffic. In both cases, the forecasts were not simply biased, as well-known literature on megaproject failures has clearly shown: Italian lines were deliberately designed to increase the cost, and the Spanish network was deliberately planned out-of-scale. By means of the two cases, the paper will show that the core of the problem does not lie in the wrong estimations, but in deliberate choices of overinvestment, overdesign and overquality.
2018
Cost overrun; Demand estimation; High-speed rail; Italy; Megaprojects; Optimism bias; Spain; transport
File in questo prodotto:
File Dimensione Formato  
Beria et al 2018 - Delusions of success.pdf

Accesso riservato

Descrizione: Beria et al 2018 - Delusion of success
: Publisher’s version
Dimensione 2.83 MB
Formato Adobe PDF
2.83 MB Adobe PDF   Visualizza/Apri
11311-1122504_Beria.pdf

accesso aperto

: Post-Print (DRAFT o Author’s Accepted Manuscript-AAM)
Dimensione 2.93 MB
Formato Adobe PDF
2.93 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1122504
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 47
  • ???jsp.display-item.citation.isi??? 29
social impact