Indoor mould is usually discussed for the building operation phase rather than the design stage. Moreover, the majority of existing studies were conducted by mechanical engineers rather than architects, who typically have a broader view of the whole project. The purpose of this paper is to obtain a quantitative mould risk scenario across the Yangtze River Delta in China and make a matrix including all the possible design chances to reduce the mould risk. A series of software is utilized to simulate the mould risk in three main cities across that region. Simulation results confirm high mould risk in all selected cities and the mould growth rates in different orientations match the Wind-Driven-Rain diagram. After the simulation, all factors that can be tuned for the mould prevention were analysed. Authors found that only humidity and substrate (material of finishing layer) characteristics can be practically controlled for the mould avoidance. Meanwhile, the Development Design Stage is the essential design phase while the envelope is the most crucial building element for mould prevention.

Reduce Mould Risk during the Building Design Stage: Case Studies in Southeast China

Shenghuan Zhao;de angelis E.
In corso di stampa

Abstract

Indoor mould is usually discussed for the building operation phase rather than the design stage. Moreover, the majority of existing studies were conducted by mechanical engineers rather than architects, who typically have a broader view of the whole project. The purpose of this paper is to obtain a quantitative mould risk scenario across the Yangtze River Delta in China and make a matrix including all the possible design chances to reduce the mould risk. A series of software is utilized to simulate the mould risk in three main cities across that region. Simulation results confirm high mould risk in all selected cities and the mould growth rates in different orientations match the Wind-Driven-Rain diagram. After the simulation, all factors that can be tuned for the mould prevention were analysed. Authors found that only humidity and substrate (material of finishing layer) characteristics can be practically controlled for the mould avoidance. Meanwhile, the Development Design Stage is the essential design phase while the envelope is the most crucial building element for mould prevention.
In corso di stampa
moisture; building envelope; building science; building design; building pathology
File in questo prodotto:
File Dimensione Formato  
JCDC Early View_Shenghuan Zhao.pdf

accesso aperto

: Pre-Print (o Pre-Refereeing)
Dimensione 1.41 MB
Formato Adobe PDF
1.41 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1072354
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact