A novel configuration of the CaâCu looping process is proposed for the production of a H2-enriched fuel gas by means of the sorption enhanced water gas shift (SEWGS) of blast furnace gas (BFG) in steel mills. CO2is simultaneously removed from the gas using a CaO-based sorbent. A Cu/CuO chemical loop supplies the energy required for the regeneration of the sorbent via the exothermic reduction of CuO with coke oven gas (GOG). The process is carried out in an arrangement of interconnected fluidized-bed reactors operating at atmospheric pressure, which allows for a solidsâ segregation step to be introduced that will reduce significantly the solid circulation between reactors A reference case study is presented, where the SEWGS is operated at 600 °C and the regeneration of the sorbent at 870 °C. About 27% of the BFG can be decarbonized in the SEWGS reactor producing 110 Nm3of H2per tonne of steel. A CO2capture ratio of 31% with respect to the total carbon emissions in the steel mill can be achieved. More than 60% of the thermal input can be recovered as high-temperature heat, which could be efficiently recovered for producing electricity.
Conceptual design of a Ca-Cu chemical looping process for hydrogen production in integrated steelworks
Martinez, Isabel;Romano, Matteo C.
2017-01-01
Abstract
A novel configuration of the CaâCu looping process is proposed for the production of a H2-enriched fuel gas by means of the sorption enhanced water gas shift (SEWGS) of blast furnace gas (BFG) in steel mills. CO2is simultaneously removed from the gas using a CaO-based sorbent. A Cu/CuO chemical loop supplies the energy required for the regeneration of the sorbent via the exothermic reduction of CuO with coke oven gas (GOG). The process is carried out in an arrangement of interconnected fluidized-bed reactors operating at atmospheric pressure, which allows for a solidsâ segregation step to be introduced that will reduce significantly the solid circulation between reactors A reference case study is presented, where the SEWGS is operated at 600 °C and the regeneration of the sorbent at 870 °C. About 27% of the BFG can be decarbonized in the SEWGS reactor producing 110 Nm3of H2per tonne of steel. A CO2capture ratio of 31% with respect to the total carbon emissions in the steel mill can be achieved. More than 60% of the thermal input can be recovered as high-temperature heat, which could be efficiently recovered for producing electricity.File | Dimensione | Formato | |
---|---|---|---|
2017 - Fernandez, Martínez, Abanades, Romano.pdf
Accesso riservato
Descrizione: Full paper
:
Publisher’s version
Dimensione
1.07 MB
Formato
Adobe PDF
|
1.07 MB | Adobe PDF | Visualizza/Apri |
11311-1042936_Romano.pdf
accesso aperto
:
Post-Print (DRAFT o Author’s Accepted Manuscript-AAM)
Dimensione
398.69 kB
Formato
Adobe PDF
|
398.69 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.