The scope of work presented in this paper is to provide a BIM-based workflow supporting clients and contractors in construction site surveying. It is well known that BIM technology offers many profitable issues that benefit owners, designers and constructors, especially in terms of design efficiency and interoperability. Moreover, it can become a powerful instrument for the client’s team and the General Contractor all along the construction phase, starting from the construction site organization to answer the bid requests. It can also support the supervision of work progress and amount, and allow to periodically reconsider them in compliance with available resources. Starting from these statements, the authors have developed some studies to obtain a systematic and methodological approach for site surveying and optimization. Then, the research focuses primarily on the definition of proper requirements to outline a 5D site management throughout the whole construction process. After the definition of different needs for the different actors of construction process, the research moved to the possible BIM use for the satisfaction of these needs by the definition of customized parameters dealing with site spaces and facilities, quantities, time and cost management. The parameters have been identified to respond the needs of the on-field case study concerning the realization of a school complex in Cernusco sul Naviglio (Milan). Furthermore the field test proved efficiency and promptness to changes of the developed method in particular concerning scheduling optimization. By further inspections, this process is also supposed to become an instrument of dialog and comparison with the Health & Safety team, to verify work items clashes against health and safety on construction site.

5D BIM FOR CONSTRUCTION SITE SURVEYNG

TRANI, MARCO LORENZO AGOSTINO;CASSANO, MANUELE;
2016-01-01

Abstract

The scope of work presented in this paper is to provide a BIM-based workflow supporting clients and contractors in construction site surveying. It is well known that BIM technology offers many profitable issues that benefit owners, designers and constructors, especially in terms of design efficiency and interoperability. Moreover, it can become a powerful instrument for the client’s team and the General Contractor all along the construction phase, starting from the construction site organization to answer the bid requests. It can also support the supervision of work progress and amount, and allow to periodically reconsider them in compliance with available resources. Starting from these statements, the authors have developed some studies to obtain a systematic and methodological approach for site surveying and optimization. Then, the research focuses primarily on the definition of proper requirements to outline a 5D site management throughout the whole construction process. After the definition of different needs for the different actors of construction process, the research moved to the possible BIM use for the satisfaction of these needs by the definition of customized parameters dealing with site spaces and facilities, quantities, time and cost management. The parameters have been identified to respond the needs of the on-field case study concerning the realization of a school complex in Cernusco sul Naviglio (Milan). Furthermore the field test proved efficiency and promptness to changes of the developed method in particular concerning scheduling optimization. By further inspections, this process is also supposed to become an instrument of dialog and comparison with the Health & Safety team, to verify work items clashes against health and safety on construction site.
2016
BACK TO 4.0: RETHINKING THE DIGITAL CONSTRUCTION IN DUSTRY
978-88-916-1807-8
File in questo prodotto:
File Dimensione Formato  
ISTeA 2016 - Paper.pdf

Accesso riservato

Descrizione: Articolo principale
: Publisher’s version
Dimensione 577.65 kB
Formato Adobe PDF
577.65 kB Adobe PDF   Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11311/1011904
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact