The present paper deals with the results of one month monitoring campaign of operating regimes of an existing ac arc furnace facility and its impact on power quality. Synchronized measurements were carried on in different points of the supply system of the arc furnace facility. Different supply schemes of the electric arc furnace facility were proposed and implemented, monitoring the power quality indices in seven points.
Flicker monitoring campaign in EAF facilities equipped with STATCOM
ZANINELLI, DARIO;
2016-01-01
Abstract
The present paper deals with the results of one month monitoring campaign of operating regimes of an existing ac arc furnace facility and its impact on power quality. Synchronized measurements were carried on in different points of the supply system of the arc furnace facility. Different supply schemes of the electric arc furnace facility were proposed and implemented, monitoring the power quality indices in seven points.File in questo prodotto:
| File | Dimensione | Formato | |
|---|---|---|---|
|
07783407.pdf
Accesso riservato
:
Publisher’s version
Dimensione
956.82 kB
Formato
Adobe PDF
|
956.82 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


