Sfoglia per Autore  

Opzioni
Mostrati risultati da 1 a 18 di 18
Titolo Data di pubblicazione Autori File
Integrating operation design into infrastructure planning to foster robustness of planned water systems 1-gen-2017 BERTONI, FEDERICAGIULIANI, MATTEOCASTELLETTI, ANDREA FRANCESCO
Scenario-based fitted Q-iteration for adaptive control of water reservoir systems under uncertainty 1-gen-2017 BERTONI, FEDERICAGIULIANI, MATTEOCASTELLETTI, ANDREA FRANCESCO
Scenario-based fitted Q-iteration for adaptive control of water reservoir systems under uncertainty 1-gen-2017 BERTONI, FEDERICAGIULIANI, MATTEOA. Castelletti
Integrated water-energy system modelling for optimal hydropower production planning under changing climate in the Zambezi River 1-gen-2018 CARLINO, ANGELOF. BertoniA. Castelletti
Water-related disease control via dam operation: balancing hydropower production and malaria spreading on Kariba reservoir 1-gen-2018 BIANCHI, PAOLO REDOGIANELLI, LUCAA. CastellettiF. Bertoni +
An inverse nested approach to optimize planning and operation of water reservoir systems 1-gen-2018 F. BertoniM. GiulianiA. Castelletti
OPTIMAL INFRASTRUCTURE EXPANSION SEQUENCING AND MANAGEMENT TO MEET WATER, FOOD AND ENERGY DEMANDS IN THE ZAMBEZI RIVER BASIN 1-gen-2019 F BertoniM GiulianiA CastellettiM Micotti +
Do we understand performance dependencies, trade-offs, information value, and robustness in dam design and operation? 1-gen-2019 F. BertoniA. CastellettiM. Giuliani +
Balancing hydropower revenue and malaria control via dam operation: a case study in the Zambezi river basin 1-gen-2019 F. BertoniA. Castelletti +
How does uncertainty affect cooperation strategies in transboundary water resources systems? A case study on the Zambezi River Basin 1-gen-2019 S. CazzanigaF. BertoniM. GiulianiA. Castelletti
Exploring how reservoir design and operational trade-offs are shaped by information feedbacks 1-gen-2019 F. BertoniA. CastellettiM. Giuliani +
Do we understand performance dependencies, trade-offs, and robustness in dam design and operation? 1-gen-2019 F. BertoniA. CastellettiM. Giuliani +
Optimal Infrastructure Sequencing and Management in the Zambezi River Basin 1-gen-2019 J. ZatarainF. BertoniM. GiulianiA. Castelletti
Discovering Dependencies, Trade-offs, and Robustness in Joint Dam Design and Operation: An Ex-post Assessment of the Kariba Dam 1-gen-2019 F. BertoniA. CastellettiM. Giuliani +
Robust Infrastructure Sequencing and Management for Growing Food Energy and Water Demands in the Zambezi River Basin 1-gen-2020 Bertoni, FedericaGiuliani, MatteoCastelletti, Andrea +
Informed water infrastructure design: improving coupled dam sizing and operation by streamflow forecasts 1-gen-2020 Castelletti, AndreaBertoni, FedericaGiuliani, Matteo +
Dam reoperation for controlling water-related diseases: the potential of floating solar for compensating hydropower losses 1-gen-2020 Amaranto, AlessandroBertoni, FedericaCastelletti, Andrea +
Integrated Design of Dam Size and Operations via Reinforcement Learning 1-gen-2020 F. BertoniM. GiulianiA. Castelletti
Mostrati risultati da 1 a 18 di 18
Legenda icone

  •  file ad accesso aperto
  •  file disponibili sulla rete interna
  •  file disponibili agli utenti autorizzati
  •  file disponibili solo agli amministratori
  •  file sotto embargo
  •  nessun file disponibile